Solar installation in Peshawar
We design, supply and install solar systems across Peshawar and the surrounding districts of Khyber Pakhtunkhwa, using our own engineers rather than subcontractors. Every job starts with a site survey and a load calculation, because the size of a system is decided by what you run and when you run it, not by the size of your house or your bill. We fit daytime systems for premises that use power in daylight and hybrid systems with lithium storage where the evening and load shedding matter, and we handle the net metering application end to end.
How an installation actually runs
You tell us what you run. The load calculator on this site does the arithmetic from your appliances, or you send us a recent bill and we work from that. Either way we want a room-by-room picture rather than a monthly total, because two houses with identical bills can need quite different systems.
We survey the site. An engineer checks the roof structure and what it can carry, measures the usable area, looks at shading through the day rather than at one moment, and inspects your existing wiring and earthing. It takes about an hour. If the survey changes the design or the price, we tell you before going any further.
You get an itemised quotation. Panels, inverter, mounting structure, protection equipment, wiring, labour and transport are listed separately, so you can see what each part costs rather than being handed one figure. It holds for seven days, because equipment rates move with the exchange rate.
We install and commission. A typical domestic job takes two to three days once the equipment is on site: a day for the structure and panels, a day for the inverter, wiring and protection, and commissioning last. The same team stays with the job throughout.
We show you how to run it. Before we leave you will know how to read the output, what the inverter's fault codes mean, and what to do if the supply trips.
Where we work
Peshawar and the surrounding districts of Khyber Pakhtunkhwa. Transport is quoted as a separate line, so a site further out can see exactly what the distance costs rather than having it absorbed into a larger figure.
Our workshop is in Peshawar, which matters after the installation more than during it. We repair inverters at board level here, on every major brand including ones we did not supply, so a fault is usually a visit rather than a unit posted away for weeks.
Why the survey comes first
The commonest expensive mistake in this city is a system sized from a bill. A bill tells you the energy you used; it does not tell you how much you draw at once, which is what the inverter has to supply, nor when you draw it, which is what decides whether you need a battery at all.
A shop that closes at sunset and a house that runs air conditioning until midnight can have the same monthly units and need entirely different systems. One should not be paying for lithium storage; the other cannot do without it.
After we have finished
Panels carry a 25-year performance warranty and the inverters we supply carry five years. We deal with the manufacturer on your behalf rather than sending you to the importer with a serial number.
Rinse the panels with plain water every couple of months in dry weather. Dust is the largest avoidable loss in Peshawar and a neglected array can give up around a tenth of its generation for no reason at all.
Questions we are asked
How long does a solar installation in Peshawar take?
Two to three days on site for a typical home once the equipment has arrived: structure and panels, then inverter, wiring and protection, then commissioning. The survey happens before that and takes about an hour, and ordering equipment adds a few days in between.
Do you cover areas outside Peshawar?
Yes, across Khyber Pakhtunkhwa. Transport appears as its own line on the quotation so you can see what the distance costs rather than finding it folded into a larger number.
Do you handle the net metering application?
Yes, end to end. The charge for it is a separate line on your quotation so you can see exactly what it costs.
Who does the actual work?
Our own engineers, not subcontractors, and the same team stays with your job from the structure through to commissioning. We have been doing electrical work in Peshawar since 1998 and solar since 2018, which is also why we can repair an inverter at board level instead of sending it away.
What does a solar installation cost here?
It depends on whether there is a battery, the panel capacity, and the inverter your load calls for. We quote from a load calculation rather than publishing a figure that would be wrong for most readers, and the quotation is itemised and free.
Related
Solar systems in Peshawar
Complete solar systems installed across Peshawar and Khyber Pakhtunkhwa: daytime systems from 5kVA and hybrid systems with lithium storage.
Solar systemsSolar for homes
Solar for houses in Peshawar. How to size a home system, what a battery is really for, and what it costs to own.
Solar for homesSolar for shops, offices and workshops
Solar for shops, offices and workshops in Peshawar. Daytime generation against daytime load, net metering, and work around your trading hours.
Solar for businessTell us your load and we will size it properly
Our load calculator works from the appliances you actually own, and a sales engineer prepares the quotation from it. There is no charge and no obligation.
Supplied and installed across Peshawar and Khyber Pakhtunkhwa.